What was already known
The deterministic stackability event and TreeStack root-score certificate precede this project. Bushaw–Kettle study the same fixed-total weak-composition distribution but a different pebbling event, solvability. Their threshold cannot simply be assigned to support-collapse stackability. The contribution is the stated path recovery theorem and its excursion/conditioning proof; no first-priority claim is made.
- Random model and predecessor distinctionSource-specific mathematical, attribution or finite-checking scope
How the result developed
- 30 Sept 2026 · Result reported [1]
John Fairfax-Ball reported the AI-assisted result.
See how the problem developed.
Follow new evidence and revisions to this result.
How the result developed
AI Proof Watch
A fixed-offset recovery transition for random stacking on paths
References
- [1]Original conditioning and path recovery proof
Contribution Assessment
AI involvement
John Fairfax-Ball directed the project and selected the fixed-offset recovery statement. The provenance records GPT-5.6 Sol work on the conjecture and the handoff assigns the model the conditioning and transfer proof. Substantial AI assistance was used throughout conjecture development, computational validation, Lean formalization, repository auditing, and Palomar packaging.
- AI mathematical work and human directionLines 135–141
- Agent assignment for the mathematical global-transfer proofOriginal mathematical proof assignment before later finite formalization
Importance
The result identifies a precise fixed-offset recovery transition, including the half-log-log term and constant, for one concrete random path model. Its scope is narrower than a universal stacking threshold or a full critical-window law.
Technical verification
The full asymptotic threshold is a written mathematical proof. A completed Lean build is reported for the finite P6 dependency: a nonstackable positive-mass path configuration with mass greater than (floor()+1) has an actual directed message at most , with the fixed-total consequence . The source reports successful pinned builds and no proof holes. This checks a finite deterministic part of the argument, not the excursion asymptotics, conditioning estimates or limiting probability theorem. No fresh replay was performed.
Formal checking
The full asymptotic threshold is a written mathematical proof. A completed Lean build is reported for the finite P6 dependency: a nonstackable positive-mass path configuration with mass greater than (floor()+1) has an actual directed message at most , with the fixed-total consequence . The source reports successful pinned builds and no proof holes. This checks a finite deterministic part of the argument, not the excursion asymptotics, conditioning estimates or limiting probability theorem. No fresh replay was performed.
- Checker
- Source project Lean
- Scope
- Finite deterministic P6 only; not the asymptotic recovery theorem
- Basis
- Reported by the linked checker
- Completed finite deep-message Lean checkingSource-specific mathematical, attribution or finite-checking scope
- Exact checking boundaries and predecessor attributionSource-specific mathematical, attribution or finite-checking scope
Human understanding
The mathematical notes are public, but no independent named human explanation or complete human proof review of the threshold argument is documented.
Other useful sources
- Original conditioning and path recovery proof [1]Source-specific mathematical, attribution or finite-checking scope
- Exact frozen threshold and open endpointsSource-specific mathematical, attribution or finite-checking scope
- Optimized local excursion analysisSource-specific mathematical, attribution or finite-checking scope
View revision history
Added the research timeline.
Added a source excerpt documenting AI involvement.
Curated the original path recovery proof, with finite-only checking separated from the asymptotic claim.